NL | EN

https://tiellogistics.com/uploads/images/Headers/project-hydraulic-hammer.jpg

L.C. van Tiel Logistics ships hydraulic hammer to Abu Dhabi

In September 2015 L.C. van Tiel Logistics shipped a hydraulic hammer and parts from shipper’s yard in the Netherlands to Mina Sayed, Abu Dhabi U.A.E.. The shipment consisted of  the main piece a hydraulic hammer in cradle (dimensions 1430 x 300 x 300cm – 155.000 kg) a sleeve in upending cradle (416 x 324 x 311cm – 43.000 kg), 2 pieces of counterweight (300 x 210 x 230cm – 15.000kg) and 20”SOC and 10”SOC, total weight of 252Tonnes and 150cbm. The complete transport from free on quay shippers yard until c.f.r. Mina Sayed Abu Dhabi was arranged and supervised by L.C. van Tiel Logistics. The hammer was loaded with a twinlift of  400Tonnes and 500 tonnes mobile cranes into barge for direct transshipment with Ships Gear for the hammer and shore cranes for the other pieces at Port of Antwerp onto MV Rickmers Tokyo which sailed one day later to the Middle East.

Other projects